banner
Products
Factory prices without compromising quality
Automatic Pouring Machine for Moulding Line, Letong Casting Machinery

Automatic Pouring Machine for Moulding Line, Letong Casting Machinery

Automatic Pouring Machine for Moulding Line, Letong Casting Machinery ;
Basic Info
Model NO. Letong1042
Type Clay Dry Sand
Casting Method pressure Crystallization
Sand Core Type Clay Sand Core
Application Machinery Parts
Machining EDM Machining
Material Aluminium & Aluminum Alloy
Surface Treatment Sand Blast
Surface Roughness Ra0.2
Standard ASTM
Certification CE, RoHS
MOQ 1 Set
Quality Very Good
User Casting Foundry
Transport Package PP Bag+Carton+Crate
Specification 0.2kg-11 ton
Trademark letong
Origin China
Production Capacity 500000 PCS Per Year
Product Description

Product Specifications

Craft

Lost Wax Casting , Precision Casting , Investment casting , Dewaxing Casting , silica Sol Casting , Precision Die Casting , Sand Casting.

Material

Stainless Steel(General SUS304,SUS316,1.4301),etc.,Stainless Iron(General 201,420,430),etc.,High/Middle/Low Garbon Steel(A3,Q235,45),etc.,Alloy Steel(General 20cr,20crme,20crnimo,40crmo,40crnimo,42cr,42crme,42crnimo)etc.,Brass(H59,H62,H75,H80),etc.,Red Copper,Bronze,White Copper and other materials,The above menu is for reference only, if you have special needs,please contact customer service staff.

Process

Wax Injecting War repairing ,Tree Planting , Mucilage , dewaxing , investment , Shell Vibration , Polishing , etc... 48 Processes In TotaL.

Post-processing

Ordinary Polishing , Mirror Polishing , Electrolytic Polishing , Brushed Finishing , Grinding , Heat Treatment , Finishing , Drilling and tapping , Plating,etc.

Ordering Methods

We Can manufacture And Process According To Customer's Samples Or Dravings Designs;Meanwhile We Provide Some Ready Stock for Direct Order.

Mold Lead Tine

Rush Order : 3-5 Davs . General Lead Time:7-10Days ( Peculiar Product Exception)

Sample Lead Time

Urgent Sample : 3-5 days , General Lead Time : 5-7 Days ( Peculiar Product Exception )

Order Lead Time

Urgent Orders:10-15 Days , General Lead Time:15-20 Days ( Peculiar Product Exception )

Terms of Payment

The Mold wili Be made After 100% Payment Of The mold Fee , 50% Deposit Should Be Paid In Advance , The Balance Should Be Paid Before Shipment.

Shipping Port

Tianjin port

Tax & Freight

Price Quoted Without Freight&Tax included,For other requirements Please contact customer service staff

Automatic Pouring Machine for Moulding Line, Letong Casting Machinery

Automatic Pouring Machine for Moulding Line, Letong Casting Machinery

Automatic Pouring Machine for Moulding Line, Letong Casting Machinery

Automatic Pouring Machine for Moulding Line, Letong Casting Machinery

Automatic Pouring Machine for Moulding Line, Letong Casting Machinery

Send inquiry